Thứ Hai, 26 tháng 7, 2021

American Standard T555.730, homeappliance





Download!

Installation Instructions TOWNSQUARE T555740 CENTRAL THERMOSTAT WITH VOLUME CONTROL TRIM KIT Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin. Certified to comply with ANSI A112.18.1M ASSE 1016 M968659 ROUGHING-IN DIMENSIONS 230mm (9) 190mm (7-1/2) FINISHED WALL 186mm 230mm (9) R520 (7-3/8)100mm (3-7/8) 1/2" NPT INLETS or R540 3/4" NPT INLETS 25mm 150mm NOTE: FITTING (6) MUST BE INSTALLED (1) Recommended Tools CARE INSTRUCTIONS: WITH VOLUME CONTROL ON TOP. Flat Blade Screwdriver Phillips Screwdriver 48mm to 68mm (2 to 2-5/8) To keep your new faucet looking new, please follow these simple care instructions: DO: Simply rinse the faucet clean with clear water. Dry the faucet with a soft cotton cloth. DO NOT: Do not use any abrasive cleaners, cloths, or paper towels. Do not use any cleaning agents containing acids, polish abrasives, or harsh cleaners or soaps. Regular and routine cleaning will reduce the need for heavy cleaning and polishing. If heavy cleaning is required, the following procedures are recommended: Remove as much surface dirt and film using clear water and soft cotton cloth (as described above). Use any of the following to remove tough surface film and build-up: Mild liquid detergents Clear ammonia free liquid glass cleaners Non-acidic, non-abrasive gentle liquid or fully dissolved powder cleansers mixed according to manufacturers directions. Non-abrasive liquid polishers Once clean, rinse faucet again with clear water to thoroughly remove cleaner or polish and blot dry with a soft cotton cloth. Failure to follow these care instructions may damage the Faucet's finish. 1 1 TRIM INSTALLATION Remove PLASTER GUARD (1) if attached. Push CAPS (2 & 2a) as shown onto CONTROL VALVES (3). Push ESCUTCHEON (4) over CAPS (2, 2a) and flush against finished wall. Attach with the two SCREWS (5) provided. 2 INSTALL HANDLES Align HANDLE BASE (1) and push onto KNOB MOUNT (2). 3 TOP 1 2 2a 4 5 Install LEVER HANDLE (3) as shown. Install HANDLE SCREW (4) and tighten with screwdriver. 7 9 Push INDEX CAP (5) into HANDLE (3). Install HANDLE ADAPTER (6) onto VALVE STEM (7). 6 Install HANDLE SCREW (8) and tighten. 8 Push VOLUME CONTROL KNOB (9) onto HANDLE ADAPTER (6). Use HEX WRENCH (10) supplied and tighten set screw to secure VOLUME CONTROL KNOB (9). 11 Push in PLUG BUTTON (11). 10 2 1 3 4 5 TRANSPOSED SUPPLY PIPING 3 OR BACK TO BACK INSTALLATION Should the hot and cold water supply pipes have been transposed making adjustment impossible, proceed as follows: Shut off water supply. Remove handle and rim. (Reverse steps 1 and 2. Remove check stops and re-install them transposed. Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE CHECK STOP is now on the left. Turn the water supply back on and perform the temperature adjustment in step 4. Assemble HANDLES and TRIM. CHECK STOP (RED TO BLUE) CHECK STOP (BLUE TO RED) M968659 4 TEMPERATURE ADJUSTMENT Pull out index CAP (1) and remove HANDLE SCREW (2). Pull off HANDLE ASSEMBLY (3). Check that arrow marking B points to the 3 o'clock position. If not, push the BLACK CLAMP on the SECURING RING to the right, pull off KNOB MOUNT (4) and reinstall KNOB MOUNT (4) with arrow "B" 3 o'clock position. See Figure 1. SET HOT LIMIT STOP The maximum mixed water temperature is set at 109˚F at the factory. This setting can be changed if desired. Remove the TEMPERATURE LIMIT STOP (H shaped Black Plastic part). Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water temperature to 104˚F or 112˚F. For 100˚F adjustment, turn the water supply on. Turn KNOB MOUNT (4) until the spout temperature is 100˚F. Check that arrow "A" on the KNOB MOUNT (4) still points 3 o'clock position after adjusting the thermostat to 100˚F. If not, pull out the RED LOCKING DEVICE. Remove KNOB MOUNT (4) by pulling it towards you while standing directly in front of the valve. Reinstall the KNOB MOUNT (4) with arrow "A" 3 o'clock position. Reinstall RED LOCKING DEVICE. See step 3 for HANDLE (3) installation. ARROWS AT 3 O'CLOCK POSITION Figure 1 4 KNOB MOUNT TEMPERATURE LIMIT STOP RED LOCKING DEVICE 112 109 4 12 3 ARROW "A" 104 ARROW "B" BLACK CLAMP M968659 A907090-YYY0A CAP TOWNSQUARE CENTRAL THERMOSTAT WITH VOLUME CONTROL TRIM KIT MODEL NUMBER T555740 M962635-YYY0A ESCUTCHEON AND SCREWS A918434-YYY0A ESCUTCHEON SCREWS M962636-YYY0A VOLUME CONTROL HANDLE M908587-YYY0A Replace the "YYY" with appropriate finish code CHROME BLACKENED BRONZE (PVD) SATIN NICKEL (PVD) HOT LINE FOR HELP HANDLE BASE M916815-YYY0A LEVER HANDLE 002 068 295 M962633-YYY0A HANDLE SCREW AND INDEX BUTTON For toll-free information and answers to your questions, call: 1-800 442-1902 Weekdays 8:00 a.m. to 8:00 p.m. EST IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m. to 7:00 p.m. EST Produc t names lis ted herein are trademarks o f American S tandard Inc . © AS America , Inc . 2007 M968659 Installation Instructions R520 TOP CENTRAL THERMOSTAT WITH VOLUME CONTROL Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin. ROUGHING-IN DIMENSIONS CONNECTIONS ARE: 1/2" NPT 1/2" NPT SHOWER I 3-15/16 7 I I I 3-5/8 1/2" NPT INLET Certified to comply with ANSI A112.18.1M ASSE 1016 M968255Rev.1.1 6-1/4 1/2" NPT TUB 5-7/8 1/2" NPT INLET 1-5/8 - 2-1/2 THERMOSTATIC BATH/ SHOWER INSTALLATION USING A TWIN ELL, DIVERTER SPOUT AND FIXED SHOWER C/L 80"-86" THERMOSTATIC SHOWER INSTALLATION USING A DIVERTER VALVE, FIXED SHOWER HEAD AND ADJUSTABLE HAND HELD SHOWER DIVERTER VALVE THERMOSTATIC SHOWER INSTALLATION USING A DIVERTER VALVE, FIXED SHOWER HEAD, ADJUSTABLE HAND HELD SHOWER, ON/OFF VALVE AND TWO BODY SPRAYS DIVERTER VALVE ON/OFF 18" (OPTIONAL) TWIN ELL TUB PORT MUST BE PLUGGED 4" HOT COLD HOT VALVE COLD TOP OF TUB RIM BOTTOM OF TUB IMPORTANT: WHEN NOT USING A DIVERTER SPOUT A SEPARATE DIVERTER VALVE MUST BE USED. 1/2" 1/2" TUB PORT MUST BE PLUGGED 1/2" 1/2" TUB PORT MUST BE PLUGGED NOTE: MINIMUM FLOWING PRESSURE REQUIRED FOR THIS SYSTEM OPERATING WITH ONE SHOWER HEAD AND 2 BODY SPRAYS IS 40 PSI 1 ROUGHING-IN THE VALVE WARNING DO NOT SOLDER DIRECTLY TO THE VALVE BODY; THIS WILL DAMAGE THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES. MIXED Prepare water supplies per ROUGHING-IN DIMENSIONS. Make sure the finished wall is between COLD the minimum and maximum rough dimension. Install VALVE at indicated height and depth. Make sure the "TOP" marking on the PLASTER GUARD is up. TOP Connect the hot and cold water supplies. Assemble all connecting pipes. Flush lines to remove any dirt. Connections are 1/2" NPT. HOT Assemble the connection pipe to one of the MIXED OUTLETS of the VALVE. Cap the other MIXED OUTLET. (Tub port is fitted with a plug at the factory). IMPORTANT! INSTALL ANY REQUIRED SHUT OFF OR DIVERTER VALVES INTO THE PIPING SYSTEM. 1 If the CHECK STOPS (4, 5) were removed during installation, ensure the hot and cold CHECK STOPS (4, 5) are not reversed. The hot CHECK STOP (4) has a red top and the cold CHECK STOP (5) has a blue top. CHECK STOPS (4,5) are supplied in the open position. Closing using 5/32" (4 mm) hex wrench to pressure WOOD BRACE 5 COLD PLUG TUB PORT CHECK STOP (COLD BLUE) test and to check for leaks. To flush lines, remove the CHECK STOPS (4,5) and run water. If desired, the TEMPERATURE CONTROL UNIT can be removed. Reinstall CHECK STOPS (4,5) and CONTROL UNIT (6), if it was removed. Remove PLASTER GUARD (2) if still installed. Turn on water supplies and check for leaks. Reassemble PLASTER GUARD (2) and FINISH WALL. HOT 6 3 2 PLUG TUB PORT TOP Beware of Freezing. No water should remain in the MIXING VALVE if freezing is a possibility. Remove the CHECK STOPS (4,5) to completely drain the MIXER UNIT (1). 2 TEMPERATURE ADJUSTMENT CHECK STOP (HOT RED) 4 Unscrew PLASTER GUARD SCREWS and remove PLASTER GUARD. Check that arrow marking B points vertically upwards. If not, push the BLACK CLAMP on the SECURING RING to the right, pull off KNOB MOUNT and reinstall KNOB MOUNT with arrow "B" pointing upwards. The maximum mixed water temperature is set at 109 F at the factory. This setting can be changed if desired. TEMPERATURE LIMIT STOP BLACK ARROW CLAMP "B" ARROW "A" 104 KNOB Remove the TEMPERATURE LIMIT STOP (H shaped Black Plastic part). Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water temperature to 104 F or 112 F. For 100 F adjustment, turn the water supply on. Turn KNOB MOUNT until the spout temperature is 100 F. Check that arrow marking A on the KNOB MOUNT still points upward after adjusting the thermostat to 100 F. If not, pull out the RED LOCKING DEVICE. Remove KNOB MOUNT by pulling it towards you while standing directly in front of the valve. Reinstall the KNOB MOUNT so that the arrow marking A points upwards. Reinstall RED LOCKING DEVICE. TRANSPOSED SUPPLY PIPING 3 OR BACK TO BACK INSTALLATION Should the hot and cold water supply pipes have been transposed making adjustment impossible, proceed as follows: Shut off water supply. Remove handle and rim Remove check stops and re-install them transposed. 109 112 SECURING RING RED LOCKING DEVICE CHECK STOP (BLUE TO RED) MOUNT Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE CHECK STOP is now on the left. Turn the water supply back on and perform the temperature adjustment in step 2. CHECK STOP (RED TO BLUE) M968255Rev.1.1 CENTRAL THERMOSTAT WITH VOLUME CONTROL MODEL NUMBER R520 953950-0070A CHECK STOP (COLD BLUE) 994053-0070A CARTRIDGE A918572-0070A CARTRIDGE SCREW 953960-0070A THERMOSTAT CARTRIDGE 923348-0070A HANDLE ADAPTER 953963-0070A HANDLE EXTENSION 953951-0070A CHECK STOP (HOT RED) 963434-YYY0A DEEP ROUGH KIT (SOLD SEPARATELY ) HOT LINE FOR HELP For toll-free information and answers to your questions, call: 1-800 442-1902 Weekdays 8:00 a.m. to 8:00 p.m. EST IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m. to 7:00 p.m. EST Product names listed herein are trademarks of American Standard Inc. © American Standard Inc. 2003 912647-0070A O-RING 953957-0070A TEMPERATURE CALIBRATION UNIT M968255Rev.1.1 Installation Instructions R540 3/4" CENTRAL THERMOSTAT WITH VOLUME CONTROL Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin. ROUGHING-IN DIMENSIONS CONNECTIONS ARE: 3/4" NPT 3/4" NPT SHOWER I 3-15/16 7 I I I 3-5/8 3/4" NPT INLET TOP Certified to comply with ANSI A112.18.1M ASSE 1016 M968480 6-1/4 3/4" NPT TUB 5-7/8 3/4" NPT INLET 1-5/8 - 2-1/2 THERMOSTATIC BATH/ SHOWER INSTALLATION USING A TWIN ELL, DIVERTER SPOUT AND FIXED SHOWER C/L 80"-86" THERMOSTATIC SHOWER INSTALLATION USING A DIVERTER VALVE, FIXED SHOWER HEAD AND ADJUSTABLE HAND HELD SHOWER DIVERTER VALVE THERMOSTATIC SHOWER INSTALLATION USING A DIVERTER VALVE, FIXED SHOWER HEAD, ADJUSTABLE HAND HELD SHOWER, ON/OFF VALVE AND TWO BODY SPRAYS DIVERTER VALVE ON/OFF 18" (OPTIONAL) TWIN ELL TUB PORT MUST BE PLUGGED 4" HOT COLD HOT VALVE COLD TOP OF TUB RIM BOTTOM OF TUB IMPORTANT: WHEN NOT USING A DIVERTER SPOUT A SEPARATE DIVERTER VALVE MUST BE USED. 3/4" 3/4" TUB PORT MUST BE PLUGGED 3/4" 3/4" TUB PORT MUST BE PLUGGED NOTE: MINIMUM FLOWING PRESSURE REQUIRED FOR THIS SYSTEM OPERATING WITH ONE SHOWER HEAD AND 2 BODY SPRAYS IS 40 PSI 1 ROUGHING-IN THE VALVE WARNING DO NOT SOLDER DIRECTLY TO THE VALVE BODY; THIS WILL DAMAGE THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES. MIXED Prepare water supplies per ROUGHING-IN DIMENSIONS. Make sure the finished wall is between the minimum and maximum rough dimension. Install VALVE at indicated height and depth. Make sure the "TOP" marking on the PLASTER GUARD is up. Connect the hot and cold water supplies. Assemble all connecting pipes. Flush lines to remove any dirt. Connections are 3/4" NPT. HOT COLD TOP Assemble the connection pipe to one of the MIXED OUTLETS of the VALVE. Cap the other MIXED OUTLET. (Tub port is fitted with a plug at the factory). IMPORTANT! INSTALL ANY REQUIRED SHUT OFF OR DIVERTER VALVES INTO THE PIPING SYSTEM. 1 If the CHECK STOPS (4, 5) were removed during installation, ensure the hot and cold CHECK STOPS (4, 5) are not reversed. The hot CHECK STOP (4) has a red top and the cold CHECK STOP (5) has a blue top. CHECK STOPS (4,5) are supplied in the open position. Closing using 5/32" (4 mm) hex wrench to pressure test and to check for leaks. To flush lines, remove the CHECK STOPS (4,5) and run water. If desired, the TEMPERATURE CONTROL UNIT can be removed. Reinstall CHECK STOPS (4,5) and CONTROL UNIT (6), if it was WOOD BRACE 5 COLD PLUG TUB PORT CHECK STOP (COLD BLUE) removed. Remove PLASTER GUARD (2) if still installed. Turn on water supplies and check for leaks. Reassemble PLASTER GUARD (2) and FINISH WALL. 3 2 HOT PLUG TUB PORT 6 TOP Beware of Freezing. No water should remain in the MIXING VALVE if freezing is a possibility. Remove the CHECK STOPS (4,5) to completely drain the MIXER UNIT (1). 2 TEMPERATURE ADJUSTMENT CHECK STOP (HOT RED) 4 Unscrew PLASTER GUARD SCREWS and remove PLASTER GUARD. Check that arrow marking B points vertically upwards. If not, push the BLACK CLAMP on the SECURING RING to the right, pull off KNOB MOUNT and reinstall KNOB MOUNT with arrow "B" pointing upwards. The maximum mixed water temperature is set at 109 F at the factory. This setting can be changed if desired. TEMPERATURE LIMIT STOP BLACK ARROW CLAMP "B" ARROW "A" 104 KNOB Remove the TEMPERATURE LIMIT STOP (H shaped Black Plastic part). Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water temperature to 104 F or 112 F. For 100 F adjustment, turn the water supply on. Turn KNOB MOUNT until the spout temperature is 100 F. Check that arrow marking A on the KNOB MOUNT still points upward after adjusting the thermostat to 100 F. If not, pull out the RED LOCKING DEVICE. Remove KNOB MOUNT by pulling it towards you while standing directly in front of the valve. Reinstall the KNOB MOUNT so that the arrow marking A points upwards. Reinstall RED LOCKING DEVICE. TRANSPOSED SUPPLY PIPING 3 OR BACK TO BACK INSTALLATION Should the hot and cold water supply pipes have been transposed making adjustment impossible, proceed as follows: Shut off water supply. Remove handle and rim Remove check stops and re-install them transposed. 109 112 SECURING RING RED LOCKING DEVICE CHECK STOP (BLUE TO RED) MOUNT Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE CHECK STOP is now on the left. Turn the water supply back on and perform the temperature adjustment in step 2. CHECK STOP (RED TO BLUE) M968480 3/4" CENTRAL THERMOSTAT WITH VOLUME CONTROL MODEL NUMBER R540 912647-0070A O-RING 954040-0070A THERMOSTAT CARTRIDGE A953972-0070A A953971-0070A CHECK STOP (COLD BLUE) A994352-0070A CARTRIDGE 923348-0070A HANDLE ADAPTER 918428-0070A CARTRIDGE SCREW 953963-0070A HANDLE EXTENSION 953957-0070A CHECK STOP (HOT RED) 9 6 3 4 3 4- Y Y Y 0 A DEE P ROUGH K I T (SO L D S EPA RAT E LY ) HOT LINE FOR HELP For toll-free information and answers to your questions, call: 1-800 442-1902 Weekdays 8:00 a.m. to 8:00 p.m. EST IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m. to 7:00 p.m. EST Produc t names lis ted herein are trademarks o f American S tandard Inc . © American S tandard Inc . 2003 912647-0070A O-RING TEMPERATURE CALIBRATION UNIT M968480

Không có nhận xét nào:

Đăng nhận xét

Black & Decker Black&Decker Vacuum NV4820CN, homeappliance

Download! NV2410N NV2420N NV3610N NV3620N NV4820N NV4820CN NW3620N NW4820N ACE 2 BDF 3 GHI 4 ENGLISH (Original instructions) Int...